We detected several outages today, including a longer one, at Pestalozzistraße 41 in our monitoring system.
While looking for the cause, we found out that there is intensive construction work going on in the building.
At the moment, all switches except one are online. The following rooms are connected to that switch:
Ground floor 8–12, 1st floor 117–121, 2nd floor 217–221, and 3rd floor 317–321.
We do not know whether these rooms are occupied during the renovation. If they are, please contact us immediately!
We will ask the Studierendenwerk what is going on.
Since all of our dormitories in Reutlingen are connected through this building, we hope that our hardware is not being damaged.
Update: A power line was cut and has now been repaired.
This post is also available in German de_DE